Feedback

  • Contents
 

Step 13: Post-installation tasks

  • Complete CIC server configuration in Interaction Administrator. See "Post-Installation Configuration".

  • Configure Interaction Media Server (or install it first if necessary). See the Interaction Media Server Technical Reference in the PureConnect Documentation Library.