- Contents
Interaction Migrator Technical Reference
Third Server Disaster Recovery Site Scenario
Scenarios where a Switchover pair exists at a primary site, with a third backup server at a Disaster Recovery (DR) site are becoming more common. You can use Interaction Migrator in a third server disaster recovery site scenario in an automated fashion to back up the configuration of one of the servers in the Switchover pair to the remote DR site.
Note: If the DR server has a different server name than either of the CIC servers in the Switchover pair, use Interaction Migrator’s Migration mode instead of Recovery mode.
Following are the steps for this scenario.
Implementation/Testing Phase
-
Set up server completely, short of importing configuration.
-
Image Server. Call this Image1.
-
Import newest Migrator Data and test.
If anything does not test correctly and requires a configuration change that should have been in Image1, do the following:
-
Restore CoreImage.
-
Change configuration.
-
Make new CoreImage.
-
Import Migrator Data again and retest.
-
Complete cycle until CoreImage works fine.
Note: CoreImage contains no configuration. It is ready for you to apply configuration.
Maintenance Phase
-
Record all changes to production servers that need changed on the DR server.
-
On a scheduled interval:
-
Take list of items proven in production not to cause issues as a task list.
-
Back up CoreImage to CoreImage_<date>.
If something goes wrong, you have a great audit trail of past task lists that you applied (keep those lists for long-term tracking) and you can go back to an older CoreImage:
-
Restore CoreImage.
-
Apply task list.
-
Make new image to replace CoreImage (remember, you backed it up before this step).
-
Import newest Migrator Data.
-
If something does not test correctly and requires a configuration change that should have been in Image1, do the following:
-
Restore new CoreImage made in step (e).
-
Change the configuration.
-
Make a new CoreImage to replace the one made in step (e).
-
Import Migrator Data again and retest.
-
Complete cycle until CoreImage works fine.
Disaster recovery plan
-
Examine the list of production changes since updating the last image to create a task list. You can implement all or any of these changes. Examine each as a
potential issues
list. -
Restore CoreImage.
-
Apply anything from the task list that you need.
-
Import newest Migrator Data and test.